Basic Guidelines For Socket Sizes and Usage
Listed below are examples of "typical" loadings for items plugged in to socket outlets:
| 500 watt sockets |
computers, TV’s, video’s, spotlights to 500W, refrigerators |
| 1000 watt sockets |
domestic filter coffee machines, lighting up to 1000W |
| 2000 watt sockets |
kettles**, machinery up to 2000W |
| 3000 watt sockets |
hired coffee machines, machinery 2000W to 3000W
|
Note ** kettles and refrigeration / freezer requirements vary between 200 and 2000 watts. Please check with the supplier or check the reference tag or plate on the machine.
If you have any questions about the exact electrical requirements for your stand, please contact the electrical contractor using the details above who will be happy to advise you.
Deadline Date
Orders must be received by Friday 22nd January so that the necessary mains can be ordered from the venue in sufficient time for them to be laid in the hall before general construction commences. Orders received after the deadline will incur a 20% surcharge.
NB: Exhibitors who contract into the show after Friday 22nd January will be exempt from the surcharge if orders are made prior to arriving onsite.
Enquiry Desk
During the build-up period, an enquiry desk to assist you with any electrical problems will be located outside the Organisers’ Office (under the staircase). The desk will be manned for the duration of build-up.
Supply Timetable
Electricity will be energised to stands as quickly as possible during the build-up period, subject to satisfactory inspection and testing of installations. Please head to the BDC service desk to inform them of when you want your power switched on. Occasionally delays may occur because adjoining stands are not complete and ready for inspection.
Power to stands during the open period will be switched off each evening 30 minutes after the show closes.