Space only means no walls and no electricity is provided. The BDC has a grey carpet laid throughout the venue.
All space only exhibitors are responsible for their own stand design and construction, and for ensuring that they, or their contractor, has received a written ‘Permission to Build’ before arriving onsite.
All work must be carried out in accordance with the Rules and Regulations of the venue and Local Authority. The e-Guide provides guidance on achieving common regulatory standards for events.
Exhibitors also have a responsibility to take reasonable steps to ensure that any appointed contractor has the appropriate skills, knowledge and experience to undertake the work safely. Independently audited accreditation, such as ESSA Accredited or another SSIP registered scheme, can help demonstrate contractor competence. We strongly recommend asking prospective contractors about their health & safety accreditation before appointment and keeping a record of their response with your event paperwork.
Use an ESSA Member – The Event Supplier and Services Association (ESSA) represents suppliers and contractors across the events and exhibitions industry and is committed to raising standards in health & safety, sustainability, training and contractor competence. Click here to find out more about ESSA and its work to make exhibitions safer and more efficient.
Using an ESSA member to build your stand provides additional reassurance, as members are backed by the association’s Code of Conduct, Quality Charter and Bond. Click here for more information on the benefits of using an ESSA member.
Make sure your contractor checks the location and orientation of your stand in relation to an up-to-date floorplan, and that they build within the given parameters. The thickness of walls must be calculated inside the outer dimensions of the stand. The Organisers will not be liable for any costs incurred to rectify mistakes or make adjustments on-site. Below are some considerations when planning your stand.
-
How many walls will be required? An exhibitor’s Contract to Exhibit will indicate ‘one’, ‘two’, ‘three’ or ‘four’ open sides. Three open sides indicates the need for one back wall, two open sides indicates the need for two walls etc.
-
Space only exhibitors may not make use of walls provided by neighbouring stands.
-
What are the other requirements or issues that need to be taken into consideration, e.g., store area, reception desk, and kitchen or sink requirements, disposal of waste from sampling etc.
-
What floor covering should you have? If you have a kitchen area, carpet is not a suitable floor covering – the floor here should be washable. Please see the Floorcovering section below within the General Building Stand Regulations section.
-
How much lighting do you need? Use spotlights to highlight particular products or graphics.
-
You may supply your own electrical fittings, provided that all pre-wiring is carried out before you arrive onsite. Whoever has done the wiring then needs to sign a certificate to the effect that the work has been done by qualified personnel and in accordance with all rules and regulations governing electrical installations. This certificate needs to be handed to the electrical contractor before power to the stand is made live.
-
When appointing a contractor, exhibitors should obtain guarantees that the stand will be finished and all litter and stand construction materials removed from the exhibition halls by 1100 hrs on Tuesday 2nd February. After this time should be interior dressing only.